ADVERTISEMENT

Indigenous gun trials of the Army to enter next stage by June

Updated - December 20, 2018 10:56 pm IST

Published - December 20, 2018 09:32 pm IST - New Delhi

Defence Minister Nirmala Sitharaman, Army chief Gen. Bipin Rawat and other officers after witnessing the firing of ATAGS and MBT Arjun at the Pokhran Field Firing Range in Rajasthan in 2017.

The development of the indigenously-designed heavy artillery gun, the Advanced Towed Artillery Gun System (ATAGS), has advanced to a stage where user-assisted trials of the gun are likely to start by June and the Army has begun finalising the Preliminary Specifications Qualitative Requirements (PSQR), a defence official said.

“Two guns are currently undergoing trials and another two guns will join the trials in a month,” the official, who spoke on the condition of anonymity, said. “User-assisted trials will begin from May-June while the PSQR should be ready by July,” the official added.

The ATAGS is a 155mm, 52 calibre gun being developed by the Defence Research and Development Organisation on two parallel tracks: one prototype is being built in partnership with Tata Power (Strategic Engineering Division), and the other is in collaboration with Bharat Forge. There is a sanction for production of 10 guns as part of the development process.

ADVERTISEMENT

 

The Army, which is in the process of drawing up the PSQR that details the essential and desired parameters for the gun, has already flagged a few concerns related to weight and accuracy. The gun currently weighs about 18 tonnes while the ideal weight for the army would be 14-15 tonnes. While the development team wanted the weight, accuracy and firing parameters to be relaxed in the PSQR, the Army has said that would be looked into after the user-assisted trials commence.

The gun has been undergoing development trials for some time now, with a few trials held in the Pokhran firing ranges as recently as last month.

ADVERTISEMENT

Once the PSQRs are approved, the process for formulating the final Qualitative Requirements would begin. Guns from both Bharat Forge and Tata Power would be evaluated and based on the commercial bids, the order would be split between them with the lowest bidder getting a larger order. The Defence Ministry has already approved the in-principle purchase of 150 of these guns at an approximate cost of ₹3,365 crore.

The gun has several significant features including an all-electric drive, high mobility, quick deployability, auxiliary power mode, advanced communications system, automated command and control system. It also sports a six-round magazine instead of the standard three-round magazine. This necessitates a larger chamber and is a major factor pushing up the overall weight of the system.

The Army, which has been seeking to accelerate the modernisation of its weaponry, recently inducted its first modern pieces of artillery in three decades: the M777 Ultra-Light Howitzer from the U.S. and the K9 Vajra-T tracked self-propelled artillery gun from South Korea.

This is a Premium article available exclusively to our subscribers. To read 250+ such premium articles every month
You have exhausted your free article limit.
Please support quality journalism.
You have exhausted your free article limit.
Please support quality journalism.
The Hindu operates by its editorial values to provide you quality journalism.
This is your last free article.

ADVERTISEMENT

ADVERTISEMENT